Squirebrook, Desoto – Master Bathroom Remodel

Schedule a Consultation


BEFORE                                                                                                       AFTER

  
The large shower was demolished along with a section of wall to the left. We installed a new deep soaking tub, and also moved the
toilet approx 6′ to its new location with a small pony wall separating the tub.

  
There was a large closet which was demolished to make space for the new shower. These are almost the same camera angles!

 Here’s the finished product, showing the new stunning shower, with porcelain and glass tile, and a fabulous bodyshower system!

 
This shows the new vanities – we closed off one of the original 2 bathroom doors and installed a new pocket door. We placed the new vanities against the wall instead of jutting out 90 degrees as before. The new granite counter is ‘Giallo Ornamental’ with white porcelain rectangular undermount sinks, finished with oil rubbed bronze faucets and lights, and elegant framed mirrors.

 
The toilet was moved approx 6′ to a new location to make space for the new walk-in closet. The old closet was completely demolished and extended
about 2′ forward as well as widened by 3′. We installed new espresso cabinets and drawers, with multiple rails and shelves.